Huey V4 physical cohesion leads the lab: V3 base, V2 donor, current i9/TUF/Optane kernel direction, and explicitly provisional multi-GPU work.

Huey shell presented as the primary active project beside completed pinball and console builds.
L01 · visual fieldHuey V4 occupies the primary field; completed pinball and console builds remain supporting evidence.curated photographic field · V4 dominant

ACTIVE BUILD DIRECTION

Huey V4 is the lead project.

The reset is not a vague server-farm dream. It is the physical work required to turn one shell, donor lineage, and an existing compute system into one real, serviceable machine.

V4 REGISTER

Four states, kept separate.

PHYSICAL BASIS

V3 shell

Current base body and visual identity, with mounted head, mounted right hand, and existing interaction surface.

DONOR LINEAGE

V2 material

Structures and components may be salvaged after inventory; no blanket reuse is assumed.

SELECTED KERNEL

i9 / TUF / Optane

The current external machine is intended to move inside after baseline, fit, power, cooling, storage, service, and rollback validation.

WORKING COMPUTE

Four GPUs

3 × Tesla V100 32 GB plus one 8 GB utility GPU is the strongest current candidate, not a completed configuration.

IMPLEMENTATION ORDER

Baseline before disassembly. Cohesion before acceleration.

  1. Capture the current machine.Inventory, photographs, boot state, RAID health, backups, thermals, PCIe devices, firmware, and rollback.
  2. Inventory V3 and V2.Identify final base elements, donor candidates, damage, dimensions, fasteners, wiring, and access.
  3. Design the node boundary.Motherboard and storage mounts, power domains, cable paths, cooling, service doors, weight, and emergency shutdown.
  4. Integrate the existing kernel.Move only after the physical and electrical plan is evidence-backed.
  5. Validate one machine.Boot, recovery, evidence, heat, noise, access, safe stop, and a declared useful operation.
  6. Expand compute deliberately.Measure GPU fit and topology before procurement or software commitments.
COMPUTE

Practical assignments now; inference target later.

CPU-first support

Transcription, orchestration, logging, I/O, and system duties remain the current practical direction.

Major-GPU parallel path

The intended inference path must be software-coordinated. Exact framework, model, sharding method, latency, capacity, and degraded operation remain open.

COMPLETED AND PARALLEL RECORDS

Concrete builder evidence remains part of the site.

Dirty Leroy virtual pinball playfield
COMPLETED RECORD

Dirty Leroy

Prototype virtual pinball cabinet demonstrating practical integration, repair, and revision.

Open record →
The Executive virtual pinball cabinet
COMPLETED RECORD

The Executive

A higher-finish cabinet showing that cohesion includes presentation, access, and maintainability.

Open record →
Illuminated PlayStation restoration rack
RESTORATION RECORD

PlayStation build

Legacy hardware reorganized into one deliberate physical object.

Open record →
HISTORICAL SHELVES

Lineage stays available without controlling current work.